REAL DEPLOYMENTS. PROVEN RESULTS.
WattsFuture systems are operating across Europe — from the Netherlands to Portugal.
NETHERLANDS
EV Charging on Limited Grid
A logistics operator needed high-power EV charging at a depot with a severely constrained 55 kW grid connection. WattsFuture deployed a battery buffer system with smart load balancing, delivering 124 kW of charging capacity — more than double the grid limit — without any costly grid upgrade.
GRID CONNECTION
TOTAL CHARGING CAPACITY
PORTUGAL
Solar + Battery Optimization
A large commercial installation in Portugal with 526 kW of solar PV was suffering from high curtailment and poor self-consumption. WattsFuture integrated a battery storage system and WattsRouter AI to maximize solar utilization, cut grid exports, and reduce energy costs significantly.
SOLAR PV CAPACITY
BATTERY INTEGRATION
NETHERLANDS
Commercial BESS — Hotel
A large hotel complex in the Netherlands faced crippling peak demand charges. WattsFuture installed a 2 MWh commercial battery system managed by WattsRouter AI to shave daily demand peaks, reducing grid connection costs and eliminating peak tariff exposure.
BATTERY STORAGE CAPACITY
APPLICATION